Microcement Installation and Application Services

Our 15-step system is used to guide the full application process from surface preparation to final protection. It helps ensure that each project is approached as a complete microcement system, not simply as a decorative topcoat.

Microcement Installation in Singapore

Semiforêt provides microcement application services for floors, bathrooms, walls, stairs and selected custom surfaces in Singapore.

Our application system is designed around proper substrate assessment, base preparation, reinforcement where required, controlled layering, finish consistency and sealed surface protection.

Because microcement is a thin decorative surface system, the final result depends heavily on the condition of the existing substrate and the quality of each application step. Before installation, we assess the project area, surface type, moisture risk, cracks, hollow tiles, transitions, corners and wet-area requirements.
Close-up of different textured off-white wall surfaces arranged in a row.

Standard 15-Step Application System

System Performance Highlights

Microcement performance should be understood as a result of material selection, correct substrate preparation, application quality and sealer protection. The following highlights show the performance direction of the Semiforêt system under proper application conditions.

System Performance Highlights

Capture of a black silhouette of a person riding a bicycle against a white background.

Adherence
to the  substrate

≥ 1.5N/mm²

About
Durability

Dirt Resistance

Class A

Wear-Resistance

42mg

(Speed/Load/Duration)         

Flexural strength

≥ 13N/mm²

Fire Resistance

A black and white illustration of a clock with a crescent moon and stars, showing the time as 10:10.

≥ 48MPa

Compression
Resistance

≥ 40N/mm²

Impact
Resistance

compressed
flexural ratio

< 3.5

A black and white line drawing of a bulldog wearing glasses, with a serious expression.

Maximum
aggregate size

40 Mesh

Class A

Dog paw print icon on a black background.

Scratch-Resistance

High

Silhouette of a person jumping with a skateboard against a sunset sky.

Mold-Resistance

> 99%

A black mountain silhouette with a starry sky background.

Crack-Resistance

High

Silhouette of a person climbing a mountain at sunset.

Water-Resistance

High

A black and white cartoon-style illustration of a person with glasses reading a book while sitting at a desk.

About
Strength

About
Safety

A woman sitting at a desk with a laptop and a cup of coffee, working in a bright office.

Scratch-Resistance

High

Black and white illustration of a woman with long hair, wearing a dress and holding a book.

wear-Resistance

High

Silhouette of a person climbing a mountain with the sun in the background.

Slip-Resistance

High

Black and white illustration of a banana peel.

Heat-Resistance

1.51 W.m.K

Release of formaldehyde

undetected

Black and white cartoon illustration of a person talking on the phone, sitting at a desk with a computer.

Completion Standards

Primer is applied according to system requirements.

Reinforcement mesh is installed where required.

The substrate must be properly covered and prepared before finish layers begin.

1. Base Preparation

Completion Standards

A good microcement project should be assessed not only by colour and texture, but also by base preparation, edge treatment, junction quality, sealer completion and final site cleanliness.

Our handover standard focuses on visual consistency, neat transitions, completed sealing and practical readiness for daily use.

2.Surface Finish

Finish coats are applied to the required number of layers.

Internal and external corners should appear visually neat and consistent.

Shadow gaps, wall-floor junctions, and transitions should be visually straight and clean where specified.

No obvious large-area colour inconsistency, exposed base, or material sagging should be visible under normal inspection.

Sealer must be fully completed.

The finished surface should be clean and free from obvious construction dirt.

Site waste should be cleared before handover.

The final visual effect should remain consistent with the approved sample within normal handcrafted tolerance.

3.Sealer and Final Handover

Contact Us

Hours

Monday–Saturday

9:00 AM – 5:00 PM

WhatsApp

+65 86957100

Location

73 Ubi Road 1

(Oxley Bizhub Tower 1 #07-54)

Singapore 408733